Anoka Sunrise Elementary School
Ramsey & Blaine, MN

Anoka Sunrise and Brookside Elementary Schools

Project Challenge

Design two identical elementary schools that prioritize sustainability, flexibility, and student-centered learning for a growing district.

Our Solution

Innovative Learning Environments

  • Classroom clusters with operable partitions for maximum adaptability
  • Multiple access points supporting diverse teaching methodologies
  • Small group spaces designed for project-based learning
  • Middle school-inspired layout optimized for elementary students

Efficient & Expandable Design

  • Compact two-story configuration minimizes student travel distances
  • Strategic planning enables future expansion throughout the building
  • Reduced operational costs through thoughtful space planning

Sustainable Daylighting Strategy

  • Natural light integrated into all learning spaces and core areas
  • Large skylights and clerestory windows illuminate interior circulation
  • Occupancy sensors with LED lighting optimize energy performance
  • Enhanced student wellbeing through biophilic design principles

Key Results

  • 136,000 SF of high-performance learning space per school
  • Future-ready design with built-in expansion capabilities
  • Energy-efficient systems supporting district sustainability goals
  • Flexible spaces that adapt to evolving educational needs

Client:
Anoka-Hennepin School District

Project Type:
New Construction

Square Feet:
136,000

Construction Cost:
$28.9 million each

Year Complete:
2020