Chippewa Falls High School
Bringing Career Readiness to Life
The centerpiece of this transformation is a cutting-edge CTE (Career and Technical Education) and STEM suite that prepares students for high-demand careers in technology, engineering, and skilled trades. Our design creates an integrated learning environment where theoretical knowledge meets hands-on application.
The high-performance tech education suite features specialized STEM learning spaces where students can explore everything from robotics to renewable energy. Purpose-built lab areas provide the tools and flexibility needed for advanced coursework, while innovative project-based learning pods encourage collaboration and real-world problem solving.
Flexible Spaces for Every Learning Style
Understanding that today’s students learn differently than previous generations, we designed flexible student areas that can adapt to various teaching methods and group sizes. These spaces support both independent study and collaborative projects, giving educators the versatility they need to engage every student.
Infrastructure for the Future
Beyond the visible improvements, we upgraded mechanical, electrical, and technology systems throughout the facility. These behind-the-scenes improvements ensure the building operates efficiently while supporting the advanced equipment and digital learning tools that modern education demands.
This comprehensive approach means Chippewa Falls High School is equipped not just for today’s students, but for the educational innovations of tomorrow.
Client:
Chippewa Falls Area Unified School District
Project Type:
Additions, Alterations, Major Mechanical
Square Feet:
17,340 SF Alterations, 9,530 SF Addition
Construction Cost:
$16 million
Year Complete:
2021









